Secondary resources

You can edit the number of resources assigned to a task and change how the information will be displayed on the sequencer.

The operation details in Operations Register link to the Graphical Planner secondary constraints. The Reference field and Description field in the Secondary Constraints window, is reflected in Manufacturing.

Open: Manufacturing System Manager > Operations Register > Records > New Operation or Amend Operation.

To edit a secondary resource

Open: Maintain Database > Secondary Constraints.

  1. Double-click the desired secondary constraint.

    The Edit Secondary Constraints Information window appears.

    You must not change the Name or Description because Graphical Planner will not allocate work correctly. You must edit the name and description in Manufacturing.

  2. Select the following options:
  3. Click OK.
  4. Click Save.