If you are using the Project Accounting module, use this option to issue unallocated stock items to a project.
If you issue stock items to the project and the actual cost of the stock items is unconfirmed, the average price is used to calculate the cost that is posted. When the real cost is confirmed, if there is a difference, this is posted to the project as a Confirmed Price Adjustment transaction.
Open: Stock Control > Issues > Project Issue.
Enter the details on the following tabs:
If required, select the Value for the relevant Analysis codes from the drop-down lists.
Click New value to add a value to this analysis code.
You must have selected Add New on entry when setting up analysis codes in Accounting System Manager.
Use this tab to enquire on warehouse stocking levels.
Record batch/serial numbered items for issue.
If you are using serial/batch numbered stock items when recording an internal project issue, an additional window appears. This shows all serial/batch numbers for the selected stock item.