You can create estimatesForecast project costs, based on expected costs of labour, machinery and operation times. In Manufacturing, estimates are produced for one-off items or non-repetitive batches. based on the items used in completed one-off works orders. All of the stock items, non-stock itemsItems which do not have a product record set up in Stock Control. Such items are usually bought for a specific job., operationsThe labour, machine and tool processes required to manufacture an item. and other expenses that have been used during production will be included in the estimate.
Any items originally estimated for but not used in the completed works order, will not be included in the new estimate.
Open: Works Orders > Processing > Create Estimate from One-Off.
Enter the Estimate No.
If you have selected Automatic Estimate Numbers on the Numbering tab in Estimate Settings then the estimate number will be created automatically.
The Name and Contact details appear automatically.
To create the estimate, click OK.
The new estimate will be listed in the Estimating module.