Each labour resource must belong to a labour resource group. The Labour Resource Groups window is where you set up labour resource groups.
Graphical Planner assigns works orders or works order recommendations to a specific labour resource or to a labour resource group. If you have several resources defined in the group, Graphical Planner uses the first available resource in the group.
Important! If you are using the full Manufacturing product, some information that you enter for the labour resource group must be the same as the information you entered for the Cost Headings.
In order to be compatible for use with all Manufacturing modules, you must make sure:
If you select Perform Compatibility Checks on the Environment tab in System Settings and you choose differently, you will receive a warning prompt when you save a labour resource group.
Open: Manufacturing System Manager > Labour Register > Records > Labour Resource Groups.
To edit a labour resource group, select the Group Reference and click Edit.
Description |
The process description. For example, this could be cutting, drilling, assembly or inspection. |
Cost Heading |
This defaults to the Labour cost heading. Select another cost heading if required. You cannot select a cost heading that has type Materials. |
Nominal Code |
This defaults to the Nominal Account on the cost heading. Select another Nominal Code if required. Important! If you are using the full Manufacturing product, this code must be the same as that on the cost heading. |
Overhead Nominal Code |
This defaults to the Overhead Nominal Account on the cost heading. Select another Overhead Nominal Code if required. Important! If you are using the full Manufacturing product, this code must be the same as that on the cost heading. |
Allow Cost Rate Override |
Select Allow Cost Rate Override to allow cost rate override by default for resources in the group. You cannot change the cost rate on group resources if the group is added to an operation or BOM operation record . |
Piece Work |
Select this check box if cost is based on number of items completed. |
Cost Rate |
Enter a cost rate. This is used by default when adding the labour process to operationsThe labour, machine and tool processes required to manufacture an item. for BOMA stock assembly and process costing system, which provides facilities to specify the structure of finished items in terms of sub-assemblies and components.s or estimatesForecast project costs, based on expected costs of labour, machinery and operation times. In Manufacturing, estimates are produced for one-off items or non-repetitive batches.. This is per hour value. If you select Piece Work, it is per quantity. If you know the cost rate for a particular time unit but not per hour, you can click
The Hourly Cost Rate is calculated automatically. The Hourly Cost Rate is inserted into the Cost Rate box. You can add time units, using the Time Units tab. |
Piece Work Quantity |
If you select Piece Work, enter the number of items in the Piece Work Quantity box. |
Overhead Recovery % |
The default value shown, when you add the labour resource group, is set in Cost Headings. You can amend it here. Important! If you are using the full Manufacturing product, this value must be the same as that on the cost heading. |
Efficiency % |
Enter a percentage value. This allows you to over or under inflate the efficiency of the labour resource for costing purposes. The default value is 100. Enter a different percentage value, if required. |
The default time unit, Hour, is shown.
Time units must have been set up in the Time Units settings.
The time unit, Hour, cannot be deleted.
If you are using all Manufacturing modules, have selected Perform Compatibility Checks in System Settings and have compatibility issues, the Compatibility Warnings prompt appears.
Open: Manufacturing System Manager > Labour Register > Records > Labour Resource Groups.
You cannot delete a labour resource group if there are labour resources being used that belong to the group.