Each tool resource must belong to a tool resource group. The Tool Resource Groups window is where you set up tool resource groups.
Important! If you are using the full Manufacturing product, some information that you enter for the tool resource group must be the same as the information you entered for the Cost Headings.
In order to be compatible for use with all Manufacturing modules, you must make sure:
If you select Perform Compatibility Checks on the Environment tab in System Settings and you choose differently, you will receive a warning prompt when you save a tool resource group.
Open: Manufacturing System Manager > Tool Register > Records > Tool Resource Groups.
To edit a tool resource group, select the Group Reference and click Edit.
Description |
The process description. For example, this could be cutting, drilling, assembly or inspection. |
Cost Heading |
This defaults to the Tooling cost heading. Select another cost heading if required. You cannot select a cost heading that has type Materials. |
Nominal Code |
This defaults to the Nominal Account on the cost heading. Select another Nominal Code if required. Important! If you are using the full Manufacturing product, this code must be the same as that on the cost heading. |
Overhead Nominal Code |
This defaults to the Overhead Nominal Account on the cost heading. Select another Overhead Nominal Code if required. Important! If you are using the full Manufacturing product, this code must be the same as that on the cost heading. |
Cost Rate |
Enter a cost rate. This is used by default when adding the tool resource to operationsThe labour, machine and tool processes required to manufacture an item. for BOMA stock assembly and process costing system, which provides facilities to specify the structure of finished items in terms of sub-assemblies and components.s or estimatesForecast project costs, based on expected costs of labour, machinery and operation times. In Manufacturing, estimates are produced for one-off items or non-repetitive batches.. This is a per quantity value. |
Allow Cost Rate Override |
Select Allow Cost Rate Override to allow cost rate override by default for resources in the group. You cannot change the cost rate on group resources if the group is added to an operation or BOM operation record in the Operations Register. |
Quantity |
Enter the quantity to calculate the cost rate. This is used as the default for tool resource records in the group. |
Overhead Recovery % |
The default value shown, when you add the tool resource group, is set in Cost Headings Settings. You can amend it here. Important! If you are using the full Manufacturing product, this value must be the same as that on the cost heading. |
Efficiency % |
Enter a percentage value. This allows you to over or under inflate the efficiency of the tool resource for costing purposes. |
The default time unit, Hour, is shown.
Time units must have been set up in the Time Units settings.
The time unit, Hour, cannot be deleted.
If you are using all Manufacturing modules, have selected Perform Compatibility Checks in the Environment tab in System Settings and have compatibility issues, the Compatibility Warnings prompt appears.
Open: Manufacturing System Manager > Tool Register > Records > Tool Resource Groups.
You cannot delete a tool resource group if there are tool resources being used that belong to the group.